2026-09-18 - 2026-09-25
Overview
28 Pull requests merged by 1 user
Merged
#100 Parity wave 2: recurring tasks and work history
Merged
#99 Parity wave 1: hierarchy, organization, date-only planning, linked issues, and archived history
Merged
#97 Port 19.1.0 parity re-pin and import field dispositions to main
Merged
#96 Record owner exclusion of E2E encryption and third-party sync (#94)
Merged
#95 Pin Super Productivity 19.1.0 parity matrix and classify every export section
Merged
#89 Add Planner details actions and explicit sync conflict recovery
Merged
#88 Rebuild pages with shared components and add Planner day/week grid
Merged
#87 Add shared UI primitives for page migration
Merged
#86 Implement the hybrid design system
Merged
#85 Isolate planner loading and invalidate obsolete session requests
Merged
#84 Remove inactive persistence stores and document live transaction authority
Merged
#83 Expose owner-scoped notification delivery receipt status
Merged
#82 Confirm assistant test notifications with atomic queue and replay receipt
Merged
#81 Queue durable notification tests with bounded delivery retries
Merged
#80 Add revision-bound planning and notification preference tools
Merged
#79 Version planning and notification preferences for stale-safe confirmation
Merged
#78 Add day-plan and redacted notification assistant reads
Merged
#77 Reconcile the approved roadmap and old implementation plans
Merged
#73 Expose checklist reads and atomic assistant mutations
Merged
#72 Make checklist mutations atomic and validate parent ownership
Merged
#71 Add project/tag lifecycle and task assignment assistant tools
Merged
#70 Make project/tag lifecycle atomic and support restore
Merged
#69 Pin Super Productivity source and map full parity work
Merged
#68 Integrate reviewed import, assistant inventory, and calendar contract stack into main
Merged
#62 Define Google-Baikal authority, conflict, and recovery contracts
Merged
#61 Inventory assistant capability gaps and enforce catalog/API coverage
Merged
#54 Support bounded 16 MiB Super Productivity imports
Merged
#53 Deliver Sprint 14 reliability and initial migration/assistant workflows
2 Pull requests proposed by 1 user
Proposed
#101 Stop blocking real imports on stale issue metadata and repeated child IDs
Proposed
#103 Parity wave 3: counters and metrics, plugin data, saved day order
32 Issues closed from 1 user
Closed
#42 Implement recurring tasks and preserve Super Productivity repeat configurations
Closed
#41 Deliver time-history import, manual correction, and reporting parity
Closed
#29 Preserve date-only planning, reminders, and daily planning behavior
Closed
#28 Complete project, tag, note, backlog, and lifecycle parity
Closed
#27 Implement full task hierarchy and child-task metadata parity
Closed
#38 Preserve archived tasks and unresolved historical identities during migration
Closed
#30 Preserve linked issues, attachments, and integration metadata
Closed
#59 Assistant operations: day-plan, planning preferences, and notification controls
Closed
#22 Reconcile stale roadmap, architecture, and delivery documentation
Closed
#56 Assistant operations: checklist subtask creation, editing, ordering, and deletion
Closed
#55 Assistant operations: project and tag lifecycle plus task assignment
Closed
#17 Pin Super Productivity versions and complete the functional parity matrix
Closed
#94 Decide whether end-to-end encryption or third-party storage sync is a parity requirement
Closed
#16 Qualify Sprint 14 session recovery, Planner ranges, and freshness for release
Closed
#14 Verify remaining browser delivery: deadline recovery and command-bar keyboard flow
Closed
#76 Finish semantic component migration and remove only unused legacy styles
Closed
#74 Reconcile inactive persistence stores with the live transaction authority
Closed
#20 Specify Baikal canonical state and Google calendar mapping/conflict contracts
Closed
#19 Maintain a complete UI-to-MCP capability and permission matrix
Closed
#18 Support larger Super Productivity previews with bounded upload limits
Closed
#2 Roadmap: complete sync v2, capture, and habits
Closed
#5 Epic: Habits product completion
Closed
#4 Epic: Resolved structured task capture
Closed
#3 Epic: Sync v2 mutation and replay safety
Closed
#13 Habits: build accessible workspace UI
Closed
#12 Habits: complete API, automation, and sync integration
Closed
#11 Capture: wire web, quick-add, and automation surfaces
Closed
#10 Capture: harden grammar and atomically resolve task references
Closed
#9 Sync v2: migrate IndexedDB and replay preserved outbox
Closed
#8 Sync v2: validate reset before mutation and project new entities
Closed
#7 Sync v2: apply deadline and habit mutations atomically
Closed
#6 Sync v2: define operation and snapshot contracts
59 Issues created by 1 user
Opened
#15 Roadmap: Super Productivity parity, assistant access, and the Google-Baikal hub
Opened
#16 Qualify Sprint 14 session recovery, Planner ranges, and freshness for release
Opened
#17 Pin Super Productivity versions and complete the functional parity matrix
Opened
#18 Support larger Super Productivity previews with bounded upload limits
Opened
#19 Maintain a complete UI-to-MCP capability and permission matrix
Opened
#20 Specify Baikal canonical state and Google calendar mapping/conflict contracts
Opened
#21 Complete the pinned seven-day production soak and stable-release qualification
Opened
#22 Reconcile stale roadmap, architecture, and delivery documentation
Opened
#23 Review Gitea default branch mismatch with active main development
Opened
#24 Decide and qualify native mobile delivery when platform needs justify it
Opened
#25 Evaluate PostgreSQL only against measured SQLite deployment limits
Opened
#26 Audit ownership and decide multi-user or sharing scope before implementation
Opened
#27 Implement full task hierarchy and child-task metadata parity
Opened
#28 Complete project, tag, note, backlog, and lifecycle parity
Opened
#29 Preserve date-only planning, reminders, and daily planning behavior
Opened
#30 Preserve linked issues, attachments, and integration metadata
Opened
#31 Close remaining boards, counters, metrics, focus, and plugin parity gaps
Opened
#32 Complete missing assistant operations through shared domain contracts
Opened
#33 Align assistant confirmation policy with ordinary edits, bulk actions, and deletions
Opened
#34 Implement scoped OAuth authorization for hosted MCP
Opened
#35 Qualify bundled and existing-instance Baikal setup for the calendar hub
Opened
#36 Add explicit Google write consent and writable-calendar capability handling
Opened
#37 Reconcile development commits and qualify the next deployment candidate
Opened
#38 Preserve archived tasks and unresolved historical identities during migration
Opened
#39 Qualify installed Codex and Claude plugins with scoped owner workflows
Opened
#40 Implement durable Google-Baikal mappings, outbox, and loop-free two-way sync
Opened
#41 Deliver time-history import, manual correction, and reporting parity
Opened
#42 Implement recurring tasks and preserve Super Productivity repeat configurations
Opened
#43 Deliver hosted MCP transport for OpenAI/Codex and Claude clients
Opened
#44 Qualify optional subscription-backed embedded assistant runtimes
Opened
#45 Preserve recurrence, exceptions, all-day dates, and invitation semantics in the bridge
Opened
#46 Run bounded calendar synchronization without an open browser
Opened
#47 Qualify a full Super Productivity import and reconcile real workflows
Opened
#48 Expose calendar mapping, pending writes, conflicts, and recovery controls
Opened
#49 Qualify replacement readiness and perform a reviewed migration cutover
Opened
#50 Qualify Google and both Baikal deployment modes end to end
Opened
#51 Evaluate additional task import adapters after Super Productivity parity
Opened
#52 Define post-parity product improvements from replacement experience
Opened
#55 Assistant operations: project and tag lifecycle plus task assignment
Opened
#56 Assistant operations: checklist subtask creation, editing, ordering, and deletion
Opened
#57 Assistant operations: template, set, pool, and placeholder authoring
Opened
#58 Assistant operations: move and remove existing task time blocks
Opened
#59 Assistant operations: day-plan, planning preferences, and notification controls
Opened
#60 Assistant operations: import, publication, and connector recovery workflows
Opened
#63 Parity: boards, sections, and configurable task views
Opened
#64 Parity: simple counters, metrics, and history views
Opened
#65 Parity: focus preferences, idle handling, and break workflows
Opened
#66 Parity: plugin capabilities and preserved plugin data
Opened
#67 Parity: application preferences, shortcuts, and workspace behavior
Opened
#74 Reconcile inactive persistence stores with the live transaction authority
Opened
#75 Extract app orchestration by workflow while preserving offline and session recovery
Opened
#76 Finish semantic component migration and remove only unused legacy styles
Opened
#90 Parity: capture syntax for estimates, tag creation, URLs, and markdown/email paste
Opened
#91 Parity: iCal subscriptions, event-to-task conversion, and hidden calendar events
Opened
#92 Queue offline writes for planned time, project/tag assignment, projects, tags, and checklist items
Opened
#93 User-facing Tadooer data export and restore
Opened
#94 Decide whether end-to-end encryption or third-party storage sync is a parity requirement
Opened
#98 Parity: persisted Today order, planner-day order, and daily planning rituals
Opened
#102 Decide whether Tadooer supports a permissioned extension runtime